Sentry Equipment Parts

  • Home
  • Shop
  • Parts
  • Equipment Maintenance
  • My Account

Proper Assembly of MTS System

mts system g
Proper Assembly of MTS System - RMT
  • Use original OEM Electro Freeze RED line transfer hose.
  • Never twist the hose – RED line should be visible around pump
  • Replace the hose every 30/60 days or sooner based on volume and inspection
  • Ensure clamps are hand tightened for proper operation
  • Air meter should be clear of mix
  • Duckbill should be inserted in mix cane
mts stystem 2
Proper Assembly of MTS System - CMT
  • Use original Electro Freeze BLACK line transfer hose.
  • Never twist the hose – BLACK line should be straight
  • Replace the hose every 30 days or sooner based on volume and inspection
  • Ensure clamps are hand tightened for proper operation
  • Air meter should be clear of mix
  • Duckbill should be inserted in mix cane

mts system 3
Proper Assembly of MTS System - BIB
  • Step 1 - Layout clear hose upon receipt and cut into two equal pieces
  • Step 2 - Insert one end of hose onto mix cane. Hand tighten clamp. This end will be placed into the port assembly on your mix transfer system.
  • Step 3 - Insert the opposite end of the hose onto the bag adaptor. Hand tighten clamp. Insert duck bill valve into the bag adaptor (please note this is a different db valve than the MTS)
  • Step 4 - Place mix cord onto the silver probe end on both the mix cane and bag

Next: Blade Maintenance and Replacement

  • Twitter Logo
  • Instagram Logo
  • Linkedin Logo
  • Pinterest Logo
  • Twitter Logo

About This Site

Sentry Equipment has been voted a top Electro Freeze distributor for 35 straight years. Electro Freeze equipment is dependable, energy-efficient, easy to operate and clean and simple to maintain. Small wonder that Electro Freeze conceptions are some of the most utilized equipment on the market today.

Find Us

Address

1001 Lower Landing Road 606 Commerce Center Blackwood, NJ 08012

Phone

(856) 853-1967

© 2026 Sentry Equipment Parts.