Seasonal Startup Procedures – Custard

BE SURE TO DO THE TESTING AT LEAST 14 DAYS BEFORE YOUR OPENING DAY

SO ENOUGH TIME IS ALLOWED SHOULD YOU REQUIRE SERVICE

custard seasonal start up 1
custard seasonal start up 2
  • Your machine should be frost tested before you fill it with product.
  • Before you assemble your machine, install the dispense head only. DO NOT put the beaters into the cylinders.
  • If your machine is water cooled, make sure the water is on first and then the electric.
  • Turn the auto switches for both sides – place in ‘night’ & turn cabinet switch to on; allow the machine to run for 20 minutes.
  • Shut off both automatic switches and remove the dispense head. You should find both cylinders frosted. If you don't, then you have a problem and you will need service.
  • Now shut the cabinet switch off and check that the cabinet has gotten cold. If it is not cold, you will need service.
  • If the cylinders are frosted and the cabinet is cold, your refrigeration is okay.
  • Next, assemble the entire machine.
  • Take a bucket of warm water and place into cabinet with the mix pick up tubes in the water and turn on the pumps.
  • Allow the pumps to run until they shut off. Open dispense plungers on both sides.
  • If pressurized water comes out and the pumps turn back on, your pump system is okay. If not you need service.

Next: Proper Assembly of MTS System - RMT

  • Twitter Logo
  • Instagram Logo
  • Linkedin Logo
  • Pinterest Logo
  • Twitter Logo

About This Site

Sentry Equipment has been voted a top Electro Freeze distributor for 35 straight years. Electro Freeze equipment is dependable, energy-efficient, easy to operate and clean and simple to maintain. Small wonder that Electro Freeze conceptions are some of the most utilized equipment on the market today.

Find Us

Address

1001 Lower Landing Road 606 Commerce Center Blackwood, NJ 08012

Phone

(856) 853-1967

© 2026 Sentry Equipment Parts.