O-ring, Gasket, and Blade Replacement
Dispensing Door O-ring changed
Every 6 Months
Batch Door Gasket changed
Annually
Blades changed
Every 2-3 seasons
Anti Friction Pads changed
Every 2-3 seasons
Seasonal Startup - Frost Test
Batch Machines
Be sure to complete the test at least 14 days before your opening day. This will allow for enough time for service calls.
- Do not install dasher. Connect the water and drain, and turn on the water & then the electric.
- The front door must be on the machine in the closed position.
- Turn on the dasher switch to make sure the dasher motor runs.
- If the dasher motor does not run, then you need service.
- Turn on the refrigeration switch and allow it to run for about 1 to 2 minutes
- If you get a full frosted barrel in this time, then the refrigeration is good.
- If the barrel does not frost in this time, then you need service.
- Shut off both switches and assemble the machine.
- You can now begin to make product.
Watch The Videos
Replacement Pads
How to replace beater blade pads
Replacing the Front Bushing Pads
How to change the front bushing pads
Fitting The Dasher
Fitting the dasher back on the machine.
